Testimonials

It is with pleasure that I write supporting your claim in providing a domestic safeguard with your steel piling.

Today, after your steel wall of piles was fitted, there is now a normal 100% equity on the house after previous flooding problems. Moreover there is now a 20% reduction in our household insurance. The biggest advantage is the peace of mind that you have given us. We are very grateful.

Mr Raftry we are also grateful for all the care and courtesy that you provided when you installed the piling. You and your colleagues were very caring and that was much appreciated.

I recommend your service without any limitation and would be happy, if anyone who is interested in having your piling installed, to answer any queries.  

Mr RD Barnes, MD, DSc - Worcestershire

During the remediation of a former bus depot piled support was required to allow an extensive underground fuel tanks chamber to 4.5m depth to be removed, together with the excavation of diesel contaminated sands to 5.5m bgl. Sheet Pile Solutions (SPS) undertook the works on behalf of Beech Group and provided a very comprehensive service, which included design of a sheet piled solution with raked supports with installation of some 70m length of piling to 7.0m.

The whole process from mobilisation, driving, retrieving and de-mobilisation was very efficient, with both companies working closely together to achieve the very tight programme. It could not have gone better and Beech Group will definitely appoint SPS on other projects requiring specialist piling expertise.

Leon Stanger Director (Beech Group)

Sheet Pile Solutions Limited gave a proactive approach from start to finish on the job, with the works being delivered on programme.

Neil Ware, Site Manager, Galliford Try - Dicksoon Poon China Centre, Oxford

Just want to drop you a line and thank you for the way in which your works were carried out in a quick and effective manner.

The time duration which you anticipated was met and the way your operatives carried out the works was in a safe and effective way, which has also been congratulated by Lend lease on you efforts.

Once again thanks for your efforts and hopefully if we require these works to be carried out on further projects we can work together.

Colin Jones, Construction Manager, McCrory Brickworks

The ‘One St Peters Square’ development is a 13 storey building standing 60.5 meters tall with both offices and retail accommodation set within the St Peters Square conservation area. The building will provide 271,888 sq ft of grade ‘A’ office space located from the first to thirteenth floor inclusive. There is 7829 sq ft of retail accommodation available on the ground floor with a basement car park comprising of 71 car parking spaces available over a split level zone.

Following a number of pre contract interviews, DWM were appointed as the preferred groundworker on the prestigious city centre project. Whilst not directly employed by Carillion, the tight city centre project relied on good communication and site management from all of the sub-contractors and DWM’s involvement was critical during the phasing and sequencing of the basement construction. This pivotal role undertaken by DWM comprised of deep excavated obstruction removal, remediation works and piling mat installation prior to the contiguous flight auger piling operation, where they also offered a full time attendance on the rigs. In addition the bulk excavation of the basement and piles caps included the removal of spoil from site. Completing the scope was the installation of the below ground drainage systems including an attenuation tank system and a timber heading 6.0m below ground for the sewer outfall.

Several temporary works requirements were identified and DWM worked closely with Carillon Engineering Services to produce safe and effective systems including sheet piling, temporary propping arrangements, from pile caps and existing basement wall retention systems.

Overall the project was completed in a professional, safe manner and on time throughout the works, and as a result we would have no hesitation in employing or recommending DWM for similar projects.

John Currie, Project Director, Carillion

We look forward to working together in the future.

DWM carried out the sheet piling at our Dakota Hotel site in Leeds City Centre in a most professional manner: the tight site and the restricted access posed no problem to you. Your site team worked together with our site management who have nothing but praise for how it all went.

Good luck with all you do in the future.

Andy Kemp, Construction Director, GMI Construction Group

We contracted the services of DWM on one of our projects in Hull.

They were a pleasure to deal with throughout the process. At tender stage, their willingness to review and offer various cost options were instrumental in the ultimate award of the project and this was further complimented by their professional and diligent approach to the works on site.

Whilst it is the first time we have worked with Scott and his team, we are already looking at further projects with them.

Aiden McManus, Managing Director, Moortown Group